Véloroute R22
Bélgica
Kraainem

Cycle road along the R22

País
Bélgica
Ciudad
Kraainem
Estado
  • Realizado
Années et phases
  • Studies : 2019 - 2020
Compétences
Project type
  • New
Cliente
  • De Werkvennootschap
Key numbers

Tunnel : 50 m long

Bike path : 270 m long

As part of the "Works on the Ring" plan and the redevelopment program for the Brussels Ring Road (RO), the cycle route project along the R22 has been initiated.

The project involves the construction of a 50-meter-long cycle tunnel, providing a safe passage for cyclists to cross Chaussée de Louvain.

TPF Engineering was responsible for conducting structural engineering studies for the tunnel, which includes two openings and a covered section under the roadway.

Nuestra Mision

TPF Engineering produced the calculation notes as well as the formwork and execution reinforcement plans.