Dakar Emergency Plan for Access to Drinking Water from the Well Field of the Bayakh-Diender-Thieudem Axis
The project aims to reinforce drinking water supply in Dakar and involved:
- the construction and equipment of 11 new boreholes with a unit capacity of 100 to 200 m³/h (5 on the Bayakh - Diender axis and 6 on the Diender -Thieudem axis),
- the construction of a pumping station and a storage tank (1,500 m³),
- the laying of a cast iron supply pipe of nominal diameter 700/500 mm between Bayakh and Rufisque (18.6km),
- the laying of a discharge pipe between Thieudem and Bayakh stations.
Nuestra Mision
- Technical studies
- Control and works supervision