Spain

High Speed Railway Line Palencia – Aguilar de Campoo

Year
  • 2020
Country
Spain
Status
  • Realised
Capabilities
Client
  • ADIF ALTA VELOCIDAD
Sustainable development goals
Sustainable Cities and Communities

Construction of the Amusco – Osorno section

This stretch of the new high-speed rail line Palencia  Aguilar de Campoo that links Palencia to Santander extends over a length of 21.90 km.

It consists of a standard-gauge double track designed for a maximum speed of 350 km/h.

The main structures within the scope of the project are:

  • 2 viaducts, one over the Canal de Castilla (132 m long) and another one over the Arroyo Berco (30 m long),
  • 1 portal frame crossing over the existing railway line,
  • 12 overpasses,
  • 2 underpasses. 

Our mission(s)

Detailed design