Algeria
High-Speed Railway Oued Tlelat-Tlemcen
Construction of a new 130 km long double-track electrified high-speed railway line enabling trains to operate at a speed of 220 km/h
The project includes:
- 3 stations,
- 129 viaducts (14 km),
- 3 tunnels (1.5 km),
- 16,334 T of rails,
- 96 switching devices,
- 23,214,090 m³ of earth movements,
- the electrification (25kV/ 50HZ),
- the signaling and telecommunication systems (ETCS+GSM-R system).
Our mission(s)
- Project Review
- Supervision of Construction Works